The information presented on this page is for general guidance only. Urban planning by-laws remain the primary source for all official information.
Projects requiring a certificate of authorization:
- Tree Removal (Separate Application Form)
- Installation or Replacement of System Septic (Separate Application Form)
- Moving of a principal or an accessory building
- Demolition of secondary/accessory building
- Installation or construction of a temporary construction, building or structure or exercise of temporary use (Pods, Container etc.)
- Installation or alteration of a swimming pool, a hot tub or a facility providing access to a swimming pool
- Installation, alteration or replacement of a sign or a billboard
- Installation, construction or alteration of a fence, a low wall or a retaining wall of less than one (1) metre
- Installation, construction or alteration of a retaining wall that is one (1) metre high or higher
- Installing, renovate or repair a floor surface made of impermeable materials that is 50 square metres or larger
- Development or redevelopment of a parking lot, a loading and unloading area, a driveway or a curb cut.
- Hold a garage sale
- Distribution of advertising material (By-law no. 944, Art.3)
- Structures, undertakings or any works on a shore, in the littoral zone or in a floodplain
- Performing backfilling or excavation work
- Executing all structures, undertakings and works that are liable to destroy or alter the vegetation cover of a lakeshore or riverbank, expose the soil or affect the stability of the lakeshore or riverbank or encroach on the littoral zone
- Executing all structures, undertakings and works that are liable to alter the water regime, interfere with the free flow of water during flood periods, disturb plant and wildlife habitats or threaten the safety of persons and property
Depending on the nature and complexity of the project, the Town of Baie-D’Urfé reserves the right to require any additional documentation necessary to better understand the project and ensure its compliance with all applicable regulations.
Reminder: During the high season, from spring through fall, the Urban Planning Department recommends that applicants allow a minimum of 30 working days, starting from the submission of the application or the receipt of the last document required to complete the file, for the processing of certificate of authorization or projects not subject to PIIA review.
If the project is subject to PIIA review and requires approval from the TPAC, Town Council or the Demolition Committee, applicants should expect a longer timeline of at least three months, as the processing time may vary depending on when the requested additional documents are received.
This timeframe should be taken into consideration before any work begins, and applicants are encouraged to inform their contractor accordingly.
For any questions, please contact:
514 457-3321
info-urb@baie-durfe.qc.ca