Menu
- Home
- The Town
- Our Departments
- Communications
- Environment
- Finance
- Town Clerk and Legal Affairs
- Public Works
- Urban Planning
- Zoning Map
- Sectors – Map (SPAIP)
- Construction permit
- Certificates
- Tree felling
- Constructing, installing or modifying a sign, notice or billboard
- Installing or replacing a septic tank, a septic system or a weeping field
- Modifying the configuration of a landsite by excavating or backfilling
- New occupation of a commercial or industrial space
- Impermeable ground covering
- Garage sale
- Leisure
- Democratic Life
- Citizen Services
- Waste Collections
- Most Commonly Accessed Information
- Animal control
- Door-to-door solicitation
- Fireplaces and wood-burning stoves
- Garage sale
- Lots and building (Maintenance)
- Neighbouring
- Nuisance regulations
- Obstruction of ditches
- Outdoor fires
- Outside storage container
- Parking regulation
- Pesticides
- Recreational vehicles
- Septic system
- Storm water system of the Town
- Watering restrictions
- Water Meter reading
- Emergency Services
- Resources and Healthcare
- Animal Services Provider
- Senior services
- Transportation
- Online tax account
- Community Life
- News
- Events
- Maps
- Frequently asked questions
- Our Forms
- Contact Us
- Directory
- News
- Work in progress on Highway 40 eastbound will be halted for the winter period
Work in progress on Highway 40 eastbound will be halted for the winter period
Published on December 7, 2021
Please note that the Ministère des transports (MTQ) work in progress on Highway 40 eastbound will be halted for the winter period. Traffic will be re-established on Highway 40 eastbound overnight from December 10 to 11.
Please see below notice from the Ministère des Transports (available in French only).
Images Gallery
TOWN HALL
20410 Lakeshore Road
Baie-D’Urfé, Qc
H9X 1P7
Tel. : 514 457-5324
info@baie-durfe.qc.ca
UPDATES FROM
BAIE-D'URFÉ
© Copyright Town of Baie-D'Urfé. All rights reserved. | Privacy policy
