Stormwater Drainage Pipe Cleaning and Inspection Work

Published on October 27, 2026

The Town of Baie-D’Urfé wishes to inform residents that stormwater drainage pipe cleaning and camera inspection work will begin on November 2, 2026, and is expected to last approximately two weeks.

This work will help assess the condition of the stormwater drainage pipes and support the proper functioning of the Town’s drainage system.

The Town thanks residents for their understanding and cooperation during the work.

© Copyright Town of Baie-D'Urfé. All rights reserved. | Privacy policy
Top