Road Work on Lakeshore Road

Published on September 7, 2021

Work on Lakeshore Road is still progressing. The following phases will take place on September 9:

  •       Leveling work on Lakeshore Road from the Whiteside Taylor building to Morgan Street on September 9 and 10
  •        Paving work on Lakeshore Road from the Whiteside Taylor building to Morgan Street on September 14, including the Boat Club descent and Carrière Street

This work will be done from west to east. Lakeshore Road will be closed westbound at the Morgan intersection.

Whiteside Taylor users will have to use the Curling Club parking lot and walk on the sidewalk to access the Whiteside Taylor building during the two mornings of September 9 and 10. Access to the landing will be available in the afternoon.

We apologize for any inconvenience this may cause and we thank you for your cooperation.

© Copyright Town of Baie-D'Urfé. All rights reserved. | Privacy policy
Top