Menu
- Home
- The Town
- Our Departments
- Communications
- Environment
- Finance
- Town Clerk and Legal Affairs
- Public Works
- Urban Planning
- Zoning Map
- Sectors – Map (SPAIP)
- Construction permit
- Certificates
- Tree felling
- Constructing, installing or modifying a sign, notice or billboard
- Installing or replacing a septic tank, a septic system or a weeping field
- Modifying the configuration of a landsite by excavating or backfilling
- New occupation of a commercial or industrial space
- Impermeable ground covering
- Garage sale
- Leisure
- Democratic Life
- Citizen Services
- Waste Collections
- Most Commonly Accessed Information
- Animal control
- Door-to-door solicitation
- Fireplaces and wood-burning stoves
- Garage sale
- Lots and building (Maintenance)
- Neighbouring
- Nuisance regulations
- Obstruction of ditches
- Outdoor fires
- Outside storage container
- Parking regulation
- Pesticides
- Recreational vehicles
- Septic system
- Storm water system of the Town
- Watering restrictions
- Water Meter reading
- Emergency Services
- Resources and Healthcare
- Animal Services Provider
- Senior services
- Transportation
- Online tax account
- Community Life
- News
- Events
- Maps
- Frequently asked questions
- Our Forms
- Contact Us
- Directory
- News
- Morgan interchange - Marking work
Morgan interchange - Marking work
Published on September 14, 2022
Starting at 8 p.m. tonight and continuing into the night, Ali Excavation Inc., the Town's contractor, will be doing permanent marking on the service road and ramps of the Morgan Interchange in the industrial sector.
There will be no detour roads.
We thank you for your understanding and cooperation.
TOWN HALL
20410 Lakeshore Road
Baie-D’Urfé, Qc
H9X 1P7
Tel. : 514 457-5324
info@baie-durfe.qc.ca
UPDATES FROM
BAIE-D'URFÉ
© Copyright Town of Baie-D'Urfé. All rights reserved. | Privacy policy
