Drilling Work on Lakeshore road

Published on {entry_date format="%F %j, %Y"}

From December 9th to 12th, the Town will proceed to some drilling work in the area of the CPE Whiteside Taylor and the library. During this intervention, circulation will be partially closed and will be managed by road signalers.

We apologize for any inconvenience this may cause.

© Copyright Town of Baie-D'Urfé. All rights reserved. | Privacy policy
Top