- Home
- The Town
- Our Departments
- Communications
- Environment
- Finance
- Town Clerk and Legal Affairs
- Public Works
- Urban Planning
- Zoning Map
- Sectors – Map (SPAIP)
- Construction permit
- Certificates
- Tree felling
- Constructing, installing or modifying a sign, notice or billboard
- Installing or replacing a septic tank, a septic system or a weeping field
- Modifying the configuration of a landsite by excavating or backfilling
- New occupation of a commercial or industrial space
- Impermeable ground covering
- Garage sale
- Leisure
- Democratic Life
- Citizen Services
- Waste Collections
- Most Commonly Accessed Information
- Animal control
- Door-to-door solicitation
- Fireplaces and wood-burning stoves
- Garage sale
- Lots and building (Maintenance)
- Neighbouring
- Nuisance regulations
- Obstruction of ditches
- Outdoor fires
- Outside storage container
- Parking regulation
- Pesticides
- Recreational vehicles
- Septic system
- Storm water system of the Town
- Watering restrictions
- Water Meter reading
- Emergency Services
- Resources and Healthcare
- Animal Services Provider
- Senior services
- Transportation
- Online tax account
- Community Life
- News
- Events
- Maps
- Frequently asked questions
- Our Forms
- Contact Us
- Directory
- News
- Awarding of a Contract for the Reconstruction of the Bike Path
Awarding of a Contract for the Reconstruction of the Bike Path
Published on April 28, 2026
At the April 14, 2026 Council meeting, the Town Council awarded a contract to Lee Ling Paysagement for the reconstruction of the bike path connecting Clark-Graham Avenue to the EXO train station.
The project includes a complete reconstruction of the path, the installation of a new lighting network, and measures to preserve existing trees.
This work will improve travel conditions along this important route for both cyclists and pedestrians, while providing a safer and better-adapted environment for users.
Located near the industrial sector, this path also serves as an important route for workers and will help improve accessibility and connectivity within the area.
The work is expected to take place over a period of approximately six weeks between May and October 2026. Access to the train station will be maintained, although occasional traffic disruptions are expected.
TOWN HALL
20410 Lakeshore Road
Baie-D’Urfé, Qc
H9X 1P7
Tel. : 514 457-5324
info@baie-durfe.qc.ca
UPDATES FROM
BAIE-D'URFÉ
